Machines and apparatus of malting and brewingModule description #30355 / Version 3
- 6 CP
- Oral exam
- Graded
- Summer semester
- German
This module description is not valid in the current semester (Winter semester 2026/27).
| Module / Version | #30355 / #3 |
|---|---|
| Validity | Winter semester 2020/21 – Summer semester 2021 |
| Available language(s) | German |
| Credit points | 6 |
| Person responsible for the module | Flöter, Eckhard |
| Grading | Graded |
| Exam format | Oral exam |
| Language(s) of instruction | German |
Affiliation
| Faculty | Fakultät III |
|---|---|
| Institute | Institut für Lebensmitteltechnologie und Chemie |
| Academic chair | 33321900 FG Brau- und Getränketechnologie |
Contact
| Office | ACK 4 |
|---|---|
| Contact person | Gibson, Brian Richard |
| E-mail address | brian.gibson@tu-berlin.de |
| Website | Not specified |
Learning outcomes
The students should be able to:
- have knowledge of the functionality of plants and equipment in the brewing industry
- be able to evaluate scientific correlations
- have the ability to critically question and improve conventional solutions to problems or replace them with new solutions
The course provides
40 % Knowledge & Understanding
20% Analysis & Methods
40 % Application & Practice
- have knowledge of the functionality of plants and equipment in the brewing industry
- be able to evaluate scientific correlations
- have the ability to critically question and improve conventional solutions to problems or replace them with new solutions
The course provides
40 % Knowledge & Understanding
20% Analysis & Methods
40 % Application & Practice
Content
- Malting technology plants and equipment for raw material storage, conveying and cleaning, as well as for steeping, germination and kilning in the malting plant
- Design and functionality of the equipment equipment for milling the malt, mashing, lautering, wort boiling and wort cooling
- tank geometries and types of tanks for fermentation and storage
- Functionality and design of different plants for clarification, stabilization and pasteurization of beer
- de-palletizer, empty bottle removal, crate washer, bottle washer, empty bottle inspector, filler, closer, full bottle inspector, labeller, crate filling and palletizer
- Different shapes of bottles and cans and their materials (glass, PET, aluminium and tinplate), requirements for the different container shapes, basic knowledge of container and packaging testing, packaging development, legal regulations
- Design and functionality of the equipment equipment for milling the malt, mashing, lautering, wort boiling and wort cooling
- tank geometries and types of tanks for fermentation and storage
- Functionality and design of different plants for clarification, stabilization and pasteurization of beer
- de-palletizer, empty bottle removal, crate washer, bottle washer, empty bottle inspector, filler, closer, full bottle inspector, labeller, crate filling and palletizer
- Different shapes of bottles and cans and their materials (glass, PET, aluminium and tinplate), requirements for the different container shapes, basic knowledge of container and packaging testing, packaging development, legal regulations
Module components
Compulsory area
The following courses are mandatory for this module:
| Courses | Type | Number | Frequency | Language | Hours per week | Course catalog |
|---|---|---|---|---|---|---|
| Maschinen und Apparate in der Brauerei | Lecture | 0335 L 354 | Summer semester | [en] | 4 | WS 2026/27 (1) ISIS |
| Maschinen und Apparate in der Brauerei | Internship | 0335 L 355 | Summer semester | [en] | 1 | ISIS |
Courses in the course catalog
Courses created from the teaching units of this module.
Winter semester 2026/27 (1)
Maschinen und Apparate in der Brauerei (Lecture) 1
- Maschinen und Anlagen der Brauerei (Vorlesung) Termingruppe 1 0335 L 354
Workload and credit points
Maschinen und Apparate in der Brauerei (Lecture)
| Workload description | Multiplier | Hours | Total |
|---|---|---|---|
| Präsenzzeit | 15 | 4 h | 60 h |
| Vor-/Nachbereitung | 15 | 2 h | 30 h |
| Vorbereitung der Prüfungsleistung | 1 | 45 h | 45 h |
| 135 h | |||
Maschinen und Apparate in der Brauerei (Internship)
| Workload description | Multiplier | Hours | Total |
|---|---|---|---|
| Präsenzzeit | 15 | 1 h | 15 h |
| Vor-/Nachbereitung | 15 | 2 h | 30 h |
| 45 h | |||
The workload of the module adds up to 180 hours. The module therefore comprises 6 credit points.
Description of teaching and learning methods
The lecture follows a fixed thematic structure which is announced to the participants in advance. If necessary, the lecture is paused to present and discuss theoretical basics.
Before the beginning of each experimental session, the theoretical background is briefly presented and the individual steps of the experimental procedure are explained in detail with the corresponding available materials. The experiments and associated analyses are then carried out in small groups. The entire results and possible errors are then discussed both in the small groups and between the groups. A final protocol is to be written independently by each student.
Before the beginning of each experimental session, the theoretical background is briefly presented and the individual steps of the experimental procedure are explained in detail with the corresponding available materials. The experiments and associated analyses are then carried out in small groups. The entire results and possible errors are then discussed both in the small groups and between the groups. A final protocol is to be written independently by each student.
Requirements for participation and examination
Desirable prerequisites for participation in the courses:
Kenntnisse im Bereich der Elektrotechnik
Mandatory requirements for the module examination registration:
This module has no examination requirements.
Completion of the module
| Grading | Graded |
|---|---|
| Exam format | Oral exam |
| Language | German |
Duration of the module
The following number of semesters is estimated for taking and completing the module: 1 semester(s).
This module can be started in the following semesters: Summer semester.
Maximum number of participants
This module is not limited to a number of students.
Registration procedures
There is no registration necessary for the lectures. Registration for the practical course is necessary and takes place during the lecture.
The registration for the oral examination is done at the examination office "Prüfungsamt", if necessary QISPOS.
The registration for the oral examination is done at the examination office "Prüfungsamt", if necessary QISPOS.
Recommended reading, lecture notes
Lecture notes
available – Kauf der Skripte bei Semesterbeginn in der 1. Vorlesung des Semesters
Electronic lecture notes
unavailable
Recommended literature
- Günther, R., Verbrennung und Feuerung, Berlin/Heidelberg/New York, 1984
- Kunze, W., Technologie Brauer und Mälzer, VLB-Fachbücher, 2007
- Manger, H-J, Maschinen, Apparate und Anlagen für die Gärungs- und Getränkeindustrie, Teil 1 und 2, VLB-Fachbücher, 2000
- Manger, H-J., Planung von Anlagen für die Gärungs- und Getränkeindustrie, VLB-Fachbücher, 1999
- Mayr, F, Handbuch der Kesselbetriebstechnik, Gräfelfing, 1980
- Petersen, H., Brauereianlagen, Verlag Hans Carl
- Roloff,Matek, Maschinenelemente, Vieweg Verlag, 1995
Assigned programs
This module is not used in any program.
Miscellaneous
Für das Praktikum liegt die maximale Teilnehmerzahl bei 20.