Skip to content
Technische Universität Berlin Deutsch
Course catalog and module transfer system

Operation of road infrastructuresModule description #50188 / Version 8

← Module page Deutsche Fassung
This module description is not valid in the current semester (Winter semester 2026/27). Current version (v10)
Module / Version#50188 / #8
ValidityWinter semester 2023/24 – Winter semester 2023/24
Available language(s)German
Credit points6
Person responsible for the moduleRichter, Thomas
GradingGraded
Exam formatPortfolio examination
Language(s) of instructionGerman

Affiliation

FacultyFakultät V
InstituteInstitut für Land- und Seeverkehr
Academic chair35331400 FG Straßenplanung und Straßenbetrieb

Contact

OfficeTIB 3/3-3
Contact personRichter, Thomas
E-mail addresslehre@spb.tu-berlin.de
Websitehttps://www.tu.berlin/strassenplanung/

Learning outcomes

After successfully completing the module, students will be able to independently create and calculate fixed-time controlled and traffic-dependent (TD) signal programs for intersections controlled by traffic signals using the German guidelines for traffic signals (RiLSA).

To this end, they understand the time components of a signalization as well as the theoretical principles of traffic engineering on which a signal program calculation is based and are able to independently perform calculations of transition times, circulation periods and green periods on this basis.

Students will be able to design lane and phase layouts in line with requirements and check their suitability. They are also able to independently design, calculate and sketch TD logic. Students will also be able to draw and calculate associated phasing and signal timing diagrams as well as read and create signal layout plans.

They understand safety-related planning issues (e.g., additional phases, multi-lane turning, pre-running, etc.), independently recognize their implications to construction and operation, and can independently implement them as part of their work. As part of this, they are also familiar with typical conflict situations arising from the sometimes contradictory requirements of various sets of rules and laws and the significance of the RiLSA, and they understand how to deal with them. They also understand the interrelationships between RiLSA and HBS.

In addition, they understand the modes of operation and applications of parking guidance systems and the priorisation of public transport.

Content

The course is mainly dedicated to the topic of intersection control systems. It is based on the contents of the German guidelines for traffic signal systems (RiLSA) in the currently valid version.

First of all, traffic data collection methods and traffic engineering calculation models are presented. Based on this, the basic principles of intersection control systems in Germany, planning processes and safety-relevant requirements are addressed. This also includes all the necessary theoretical principles for fixed-time control (transition times, circulation periods, etc.), TC-control (detection types, flow logics, etc.) and route or network coordination.

The fundamentals required in each case will be taken up in the exercises, where a complete, first fixed-time, then TC-controlled signalization of a junction will be designed.

In addition, parking guidance systems, public transport operation control and traffic and mobility management as well as traffic control systems outside built-up areas are dealt with.

The contents of the course are supplemented by alternating guest lectures and excursions to establish the link between theory and practice ("What am I actually learning this for? How does it work in reality? Are there any new trends?").

The focus of the course is on the currently valid German planning paradigms, traffic safety, and the special concerns and difficulties in dealing with traffic light optimization for pedestrians, cyclists and public transport.

Module components

Compulsory area

The following courses are mandatory for this module:

CoursesTypeNumberFrequencyLanguageHours per weekCourse catalog
Betrieb von StraßenverkehrsanlagenIntegrated course0533 L 304 Winter semester[de]4 ISIS

Courses in the course catalog

Courses created from the teaching units of this module.

Winter semester 2026/27 (1)

Betrieb von Straßenverkehrsanlagen (Integrated course) 1

All groups of this course in the catalog

Workload and credit points

Betrieb von Straßenverkehrsanlagen (Integrated course)

Workload descriptionMultiplierHoursTotal
Homework156 h90 h
Presence time154 h60 h
Exam preparation151 h15 h
Preparation and follow-up151 h15 h
180 h

The workload of the module adds up to 180 hours. The module therefore comprises 6 credit points.

Description of teaching and learning methods

The class is an integrated course. In the lecture track, students acquire the necessary theoretical knowledge, which is taken up in the exercises and applied in practice.

In principle, the procedure for creating an intersection control system is taught on the basis of a concrete example, which is developed jointly during the semester.

The examination consists, among other things, of a homework exercise in which the contents of the lectures and exercises must be applied independently. The processing is basically analogous to the steps at the example junction in the exercises, but must be performed as an independent transfer task in a different context.

Requirements for participation and examination

Desirable prerequisites for participation in the courses:

Basic knowledge of planning and operation of road infrastructure (e.g. module "Basis of design, construction and operation of roads").

Mandatory requirements for the module examination registration:

This module has no examination requirements.

Completion of the module

GradingGraded
Exam formatPortfolio examination
Type of portfolio examination100 points in total
LanguageGerman

Test elements

NamePoints/WeightCategoryDuration/Extent
Home exercises for intersection control60practicalthroughout the semester
Learning Assessment20flexibelthroughout the semester
Test20written30 min

Duration of the module

The following number of semesters is estimated for taking and completing the module: 1 semester(s).

This module can be started in the following semesters: Winter semester.

Maximum number of participants

This module is not limited to a number of students.

Registration procedures

Instructions for the course and exam registration at: tu.berlin/strassenplanung
Email questions can be sent to: lehre@spb.tu-berlin.de.

Recommended reading, lecture notes

Lecture notes

unavailable

Electronic lecture notes

available – Wird auf ISIS bekannt zum Download zur Verfügung gestellt.

Recommended literature

  • FGSV (2015): Handbuch für die Bemessung von Straßenverkehrsanlagen - Stadtstraßen (HBS Teils S)
  • FGSV (2015): Richtlinien für Lichtsignalanlagen - RiLSA 2015
  • Schnabel/Lohse (2006): Grundlagen der Straßenverkehrstechnik und der Verkehrsplanung, Band 1 und 2.

Assigned programs

This module version is used in the following programs:

Program / program versionSemester(s)Curriculum component
Industrial Engineering and Management
Industrial Engineering and Management (M. Sc.) - StuPO 2015
WS 2023/24Ingenieurwissenschaftliche Studienrichtungen/Engineering Majors › Bauingenieurwesen/Civil Engineering (BI) › Bauingenieurwesen/Civil Engineering (Wahlpflicht/Compulsory-Elective) › Infrastructure & Water Engineering

Miscellaneous

The course teaches the basics of operating road infrastructure and is therefore a prerequisite for the follow-up module "Computer-aided operation of road infrastructures", in which the focus is no longer on basic understanding but on the workflow for creating an intersection control system and the associated specialist software.