Operation of road infrastructuresModule description #50188 / Version 9
- 6 CP
- Portfolio examination
- Graded
- Winter semester
- German
This module description is not valid in the current semester (Winter semester 2026/27).
Current version (v10)
| Module / Version | #50188 / #9 |
|---|---|
| Validity | Summer semester 2024 – Summer semester 2025 |
| Available language(s) | German |
| Credit points | 6 |
| Person responsible for the module | Richter, Thomas |
| Grading | Graded |
| Exam format | Portfolio examination |
| Language(s) of instruction | German |
Affiliation
| Faculty | Fakultät V |
|---|---|
| Institute | Institut für Land- und Seeverkehr |
| Academic chair | 35331400 FG Straßenplanung und Straßenbetrieb |
Contact
| Office | TIB 3/3-3 |
|---|---|
| Contact person | Richter, Thomas |
| E-mail address | lehre@spb.tu-berlin.de |
| Website | https://www.tu.berlin/strassenplanung/ |
Learning outcomes
After successfully completing the module, students will be able to independently carry out and interpret levels of service in accordance to the HBS for a signal-controlled junction.
They can use the German guidelines for traffic signals (RiLSA) to create and calculate fixed-time and traffic-dependent (VA) signal programmes for traffic signal-controlled junctions.
To this end, they understand the time components of a signalization as well as the theoretical principles of traffic engineering on which a signal program calculation is based and are able to independently perform calculations of transition times, circulation periods and green periods on this basis.
Students will be able to design lane and phase layouts in line with requirements and check their suitability. They are also able to independently design, calculate and sketch TD logic. Students will also be able to draw and calculate associated phasing and signal timing diagrams as well as read and create signal layout plans.
They understand safety-related planning issues (e.g., additional phases, multi-lane turning, pre-running, etc.), independently recognize their implications to construction and operation, and can independently implement them as part of their work. As part of this, they are also familiar with typical conflict situations arising from the sometimes contradictory requirements of various sets of rules and laws and the significance of the RiLSA, and they understand how to deal with them. They also understand the interrelationships between RiLSA and HBS.
In addition, they understand the modes of operation and applications of parking guidance systems and the priorisation of public transport.
They can use the German guidelines for traffic signals (RiLSA) to create and calculate fixed-time and traffic-dependent (VA) signal programmes for traffic signal-controlled junctions.
To this end, they understand the time components of a signalization as well as the theoretical principles of traffic engineering on which a signal program calculation is based and are able to independently perform calculations of transition times, circulation periods and green periods on this basis.
Students will be able to design lane and phase layouts in line with requirements and check their suitability. They are also able to independently design, calculate and sketch TD logic. Students will also be able to draw and calculate associated phasing and signal timing diagrams as well as read and create signal layout plans.
They understand safety-related planning issues (e.g., additional phases, multi-lane turning, pre-running, etc.), independently recognize their implications to construction and operation, and can independently implement them as part of their work. As part of this, they are also familiar with typical conflict situations arising from the sometimes contradictory requirements of various sets of rules and laws and the significance of the RiLSA, and they understand how to deal with them. They also understand the interrelationships between RiLSA and HBS.
In addition, they understand the modes of operation and applications of parking guidance systems and the priorisation of public transport.
Content
The course is mainly dedicated to the topic of traffic signal control, but also addresses the topic of capacity assessment of purely right-of-way controlled junctions at the beginning. The course is based on the contents of the German guidelines for traffic signal systems (RiLSA) and the Manual for the dimensioning of road traffic systems (HBS) in the currently valid version.
First of all, traffic data collection methods and traffic engineering calculation models are presented. Based on this, the basic principles of intersection control systems in Germany, planning processes and safety-relevant requirements are addressed. This also includes all the necessary theoretical principles for fixed-time control (transition times, circulation periods, etc.), TC-control (detection types, flow logics, etc.) and route or network coordination.
The fundamentals required in each case will be taken up in the exercises, where a complete, first fixed-time, then TC-controlled signalization of a junction will be designed.
In addition, parking guidance systems, public transport operation control and traffic and mobility management as well as traffic control systems outside built-up areas are dealt with.
The contents of the course are supplemented by alternating guest lectures and excursions to establish the link between theory and practice ("What am I actually learning this for? How does it work in reality? Are there any new trends?").
The focus of the course is on the currently valid German planning paradigms, traffic safety, and the special concerns and difficulties in dealing with traffic light optimization for pedestrians, cyclists and public transport.
First of all, traffic data collection methods and traffic engineering calculation models are presented. Based on this, the basic principles of intersection control systems in Germany, planning processes and safety-relevant requirements are addressed. This also includes all the necessary theoretical principles for fixed-time control (transition times, circulation periods, etc.), TC-control (detection types, flow logics, etc.) and route or network coordination.
The fundamentals required in each case will be taken up in the exercises, where a complete, first fixed-time, then TC-controlled signalization of a junction will be designed.
In addition, parking guidance systems, public transport operation control and traffic and mobility management as well as traffic control systems outside built-up areas are dealt with.
The contents of the course are supplemented by alternating guest lectures and excursions to establish the link between theory and practice ("What am I actually learning this for? How does it work in reality? Are there any new trends?").
The focus of the course is on the currently valid German planning paradigms, traffic safety, and the special concerns and difficulties in dealing with traffic light optimization for pedestrians, cyclists and public transport.
Module components
Compulsory area
The following courses are mandatory for this module:
| Courses | Type | Number | Frequency | Language | Hours per week | Course catalog |
|---|---|---|---|---|---|---|
| Betrieb von Straßenverkehrsanlagen | Integrated course | 0533 L 304 | Winter semester | [de] | 4 | WS 2026/27 (1) ISIS |
Courses in the course catalog
Courses created from the teaching units of this module.
Winter semester 2026/27 (1)
Betrieb von Straßenverkehrsanlagen (Integrated course) 1
- Betrieb von Straßenverkehrsanlagen (Integrierte Veranstaltung) 1. Termingruppe 0533 L 304
Workload and credit points
Betrieb von Straßenverkehrsanlagen (Integrated course)
| Workload description | Multiplier | Hours | Total |
|---|---|---|---|
| Homework | 15 | 6 h | 90 h |
| Presence time | 15 | 4 h | 60 h |
| Exam preparation | 15 | 1 h | 15 h |
| Preparation and follow-up | 15 | 1 h | 15 h |
| 180 h | |||
The workload of the module adds up to 180 hours. The module therefore comprises 6 credit points.
Description of teaching and learning methods
The class is an integrated course. In the lecture track, students acquire the necessary theoretical knowledge, which is taken up in the exercises and applied in practice.
In principle, the procedure for creating an intersection control system is taught on the basis of a concrete example, which is developed jointly during the semester.
The examination consists, among other things, of a homework exercise in which the contents of the lectures and exercises must be applied independently. The processing is basically analogous to the steps at the example junction in the exercises, but must be performed as an independent transfer task in a different context.
In principle, the procedure for creating an intersection control system is taught on the basis of a concrete example, which is developed jointly during the semester.
The examination consists, among other things, of a homework exercise in which the contents of the lectures and exercises must be applied independently. The processing is basically analogous to the steps at the example junction in the exercises, but must be performed as an independent transfer task in a different context.
Requirements for participation and examination
Desirable prerequisites for participation in the courses:
Basic knowledge of planning and operation of road infrastructure (e.g. module "Basis of design, construction and operation of roads").
Mandatory requirements for the module examination registration:
This module has no examination requirements.
Completion of the module
| Grading | Graded |
|---|---|
| Exam format | Portfolio examination |
| Type of portfolio examination | 100 points in total |
| Language | German |
Test elements
| Name | Points/Weight | Category | Duration/Extent |
|---|---|---|---|
| Home exercises for intersection control | 60 | practical | throughout the semester |
| Learning Assessment | 20 | flexibel | throughout the semester |
| Test | 20 | written | 30 min |
Duration of the module
The following number of semesters is estimated for taking and completing the module: 1 semester(s).
This module can be started in the following semesters: Winter semester.
Maximum number of participants
This module is not limited to a number of students.
Registration procedures
Instructions for the course and exam registration at: tu.berlin/strassenplanung
Email questions can be sent to: lehre@spb.tu-berlin.de.
Email questions can be sent to: lehre@spb.tu-berlin.de.
Recommended reading, lecture notes
Lecture notes
unavailable
Electronic lecture notes
available – Wird auf ISIS bekannt zum Download zur Verfügung gestellt.
Recommended literature
- FGSV (2015): Handbuch für die Bemessung von Straßenverkehrsanlagen - Stadtstraßen (HBS Teils S)
- FGSV (2015): Richtlinien für Lichtsignalanlagen - RiLSA 2015
- Schnabel/Lohse (2006): Grundlagen der Straßenverkehrstechnik und der Verkehrsplanung, Band 1 und 2.
Assigned programs
This module version is used in the following programs:
| Program / program version | Semester(s) | Curriculum component |
|---|---|---|
| Civil Engineering Civil Engineering (M. Sc.) - StuPO 2017 (18.01.2017) | SS 2025 | Wahlpflichtbereich › Wahlpflichtmodule › Verkehrswesen/Infrastruktur |
| WS 2025/26 | Wahlpflichtbereich › Wahlpflichtmodule › Verkehrswesen/Infrastruktur | |
| Industrial Engineering and Management Industrial Engineering and Management (M. Sc.) - StuPO 2015 | SS 2024 | Ingenieurwissenschaftliche Studienrichtungen/Engineering Majors › Verkehrswesen/Transportation Engineering (VW) › Verkehrswesen/Transportation Engineering (Wahlpflicht/Compulsory-Elective) › Automotive Engineering |
| WS 2024/25 | Ingenieurwissenschaftliche Studienrichtungen/Engineering Majors › Bauingenieurwesen/Civil Engineering (BI) › Bauingenieurwesen/Civil Engineering (Wahlpflicht/Compulsory-Elective) › Infrastructure & Water Engineering | |
| SS 2025 | Ingenieurwissenschaftliche Studienrichtungen/Engineering Majors › Verkehrswesen/Transportation Engineering (VW) › Verkehrswesen/Transportation Engineering (Wahlpflicht/Compulsory-Elective) › Automotive Engineering | |
| Technomathematics Technomathematics (M. Sc.) - StuPO 2014 | SS 2025 | Studienrichtungen › Verkehrswesen › Verkehrswesen › Planung und Betrieb |
| Transportation Planning and Operation StuPO 2017 | SS 2025 | 1. Kernmodule |
| WS 2025/26 | 1. Kernmodule |
Miscellaneous
The course teaches the basics of operating road infrastructure and is therefore a prerequisite for the follow-up module "Computer-aided operation of road infrastructures", in which the focus is no longer on basic understanding but on the workflow for creating an intersection control system and the associated specialist software.